It wasn't raining after work today. After getting home and the sun gone below the horizon, I setup for a quick priming session to touch up spots on some parts needed to assemble the elevators. Waited about 10 minutes after mixing the 2 part epoxy primer. PSI set for 20 PSI with HF paint gun trigger pulled, respirator, and eye protection on. Sprayed the parts, cleaned up the spray gun and took a shower. Watched a movie (Captain Phillips) with my wife and older son. After the movie, I brought the parts in and called it a night at midnight. Tomorrow is another day... The replacement drill should arrive tomorrow too.
I really need to start taking pictures...
This blog was created to document the adventure of building a Vans RV-10 Experimental Airplane in my garage. It serves as proof that I built it as required by the FAA.
Friday, June 10, 2016
Thursday, June 9, 2016
Quick night today. I promised the wife and kids we would watch Jurassic Park 2 today on Netflix after work today. So after a quick dinner and a shower I slipped into the garage while the kidos were getting the pop corn and movie ready. I rechecked the rivets on the rear spar that required bucking with the rivet gauge. A few shop heads were not big enough. Gave those a few more raps with the 3X rivet gun and bucking bar and all is good now. Thats it for tonight.
Received an 8 foot PVC pipe today via FedEX from Vans Aircraft. What a great way to ship the replacement J-channels for the empennage cone.
Also, contacted Cleaveland Tools and they already had a replacement drill in the mail via 2 day priority mail! Now that is what I call TOP NOTCH service. They also included a shipping label to return the defective drill!! Oh yes, I'll be ordering from them again for sure! Thank you Cleaveland Tools!! If your on the fence of who to chose for your tools, go with Cleaveland Tools. You wont regret it!
I need to post some updated pictures. I have also been messing around with time lapse videos that will be included in these blogs.
Stay tuned....
Received an 8 foot PVC pipe today via FedEX from Vans Aircraft. What a great way to ship the replacement J-channels for the empennage cone.
Also, contacted Cleaveland Tools and they already had a replacement drill in the mail via 2 day priority mail! Now that is what I call TOP NOTCH service. They also included a shipping label to return the defective drill!! Oh yes, I'll be ordering from them again for sure! Thank you Cleaveland Tools!! If your on the fence of who to chose for your tools, go with Cleaveland Tools. You wont regret it!
I need to post some updated pictures. I have also been messing around with time lapse videos that will be included in these blogs.
Stay tuned....
Wednesday, June 8, 2016
Sanded all elevator parts this morning. Masked off the trailing edge foam rib locations with blue painters tape on the elevators and trim tabs. Hung the left elevator skins on paracord strung across my side yard just outside of the garage. Used left over 16 gauge copper wire to thread through the rivet holes to hook onto the paracord. Perfect for non windy days. Grabbed two 55 gallon barrels and laid some left over rabbit cage wire with a 1" by 1" mesh on top of them. This was perfect for the smaller parts. Used 80cc (combined equal parts) of AKZO to spray the parts. 20 min later, the parts that needed flipping got flipped and sprayed. 20 min later, the parts were bone dry and moved inside for assembly.
Next, I back riveted the rib halves to the skin and noticed a few didn't get a nice coat of prime. Those remained off to get re primed. Riveted the right rear spar to the rib halves using the squeezer. I riveted the rib halves to the left top skin backwards. While drilling out those rivets, the 2 week old Sioux drill took a dump. Bummer. That threw me off my game. I was kind of stuck and couldn't go forward at this point. I setup for re prime on a few parts and then the sky opened up for the rest of the day. Went ahead and riveted the right bottom skin to the rear spar. Some of those rivets required to be drilled out. Only a few so the Sioux drill worked for those but very very very slowly.
Can't go further until the last few parts get re primed and get a new drill. Sent an email to Cleveland Tool to see if they would warranty it and what the process was. For the most part a productive day that had a few bumps. The bumps are the learning pains of a newbie builder. I have to slow down and read the plans multiple time, and double triple check the parts are laid out correctly before doing anything permanent to the airplane. Sent an email to Vans Aircraft to see if it would be acceptable to up size the drilled out rivets to -4 instead of filling them all up with oops rivets on the rib/skin error. That is it for today. Another day of building is in the near future. Stay tuned...
Tuesday, June 7, 2016
After work today, I disassembled the elevators to prep for AKZO priming. Took the skins off followed by the ribs halves, shear clips, gusset and finally the forward spar. It was a short night since I had already showered. I didn't want to get covered in aluminum dust. Tomorrow I'll sand and clean all parts and hopefully AKZO prime all parts.
Saturday, June 4, 2016
Practice Kit 2 - Control Surface
Yesterday I completed the tool box practice kit which was a HUGE confidence builder with using all the new tools. Today after some house chores, I went off to the aircraft factory (aka garage), and started on the second practice kit. On this kit I back riveted for the first time and experienced some tight space bucking. The instructions were understandable. No mistakes, or smiles anywhere. The leading edge was rolled using a 1" PVC pipe at first. The 1" pipe roll was too big leaving a very big gap between the two skins and not round enough for me. re-rolled with a 3/4" PVC pipe and the roll was tighter and rounder closing the gap. the skins still need to be pushed together some to match drill the bottom skin. After some pop rivets all was done. The aft top and bottom rivets were too tight to squeeze or buck normally. It requires the specially made tool before starting this control surface kit that I skipped. Yeah. No more skipping steps. There is a reason for vans madness. Here are a few pictures of the process.
The kit as sent from Vans.
Clecod and ready for match drill
Spar and ribs clamps ready to match drill.
Bucked forward spar to skin.
The tight aft rib rivet (not riveted here yet) requiring the special tool to be made prior to starting this kit.
Leading edge rolled and popped.
Finished product.
Friday, June 3, 2016
Vans Tool Box Practice Kit
Work was a bit slow today, so I was sent home 4 hours early. Since the practice kits had arrived today with the last of the tools, I decided to set my first rivets on the practice kits to get a feel for it before doing it on the real thing.
The tools box was straight forward. Nothing difficult about the the build really. I think the instructions aren't 100% clear in this practice kit. The Big Gotcha for me on the tool box was the hinge. The instructions were not clear enough for ME to understand. I had to take the hing apart, flip on side of the hinge THEN cut to size. Instructions said the lid hing eyelets would be facing down. Ok, not sure how else the hinge would work if it was vertically flipped with the eyelets facing up. What they wanted was to flip the eyelets so the hinge sits flush to the INSIDE of the lid and the lower hing sits flush with the outside of the box. Anyhow. I cut it without flipping the hing and then realized what they really wanted after fitting the hinge. Had to cut it again making the hinge 1 rivet hole shy.
Setting the rivets with the squeezer was a no brainer. Easy peasy. The adjustable set holder is an EXCELLENT upgrade. HUGE time saver! Its was really nice to make adjustments on the fly. The rivets on the toolbox sides were set using the pneumatic squeezer. To try something different, remember this is where I want to make my mistakes, I bucked the hing rivets. Not bad either. First 2 or 3 rivets was a trial and error type thing just getting used to the pounding vibration and POWER of the gun. Having an adjustable valve a the air hose connection on the gun was great! First rivet was nearly flattened out but acceptable for the toolbox. After that, they only got better except for the last 2 rivets for the build, the hinge rivets. Had a hard time balancing the lid vertical while attempting to apply pressure on both ends of the rivets to set it. YUP...got a whopping smile. All in all, quite impressed with my first rivets. Oh, for got to mention, all dimples were set using the DRDT-2. That thing makes making dimples so mindless I won't bother describing how easy that piece is to use.
Pictures for memories really. my first riveted piece.
The Tool box how it arrives from Vans Aircraft.
The parts...
After deburring all parts, my first rivets set with the pneumatic squeezer.
All rivets nice and flush.
The completed tool box. Now it just needs and airplane to ride in the luggage compartment with tools at the ready.
Oh yea, the first smiles. Happened on the last 2 rivets!!! Jeez....
And the stupid hinge. If this was an actual airplane part, you better believe I would have ordered a new hinge before riveting.
Work was a bit slow today, so I was sent home 4 hours early. Since the practice kits had arrived today with the last of the tools, I decided to set my first rivets on the practice kits to get a feel for it before doing it on the real thing.
The tools box was straight forward. Nothing difficult about the the build really. I think the instructions aren't 100% clear in this practice kit. The Big Gotcha for me on the tool box was the hinge. The instructions were not clear enough for ME to understand. I had to take the hing apart, flip on side of the hinge THEN cut to size. Instructions said the lid hing eyelets would be facing down. Ok, not sure how else the hinge would work if it was vertically flipped with the eyelets facing up. What they wanted was to flip the eyelets so the hinge sits flush to the INSIDE of the lid and the lower hing sits flush with the outside of the box. Anyhow. I cut it without flipping the hing and then realized what they really wanted after fitting the hinge. Had to cut it again making the hinge 1 rivet hole shy.
Setting the rivets with the squeezer was a no brainer. Easy peasy. The adjustable set holder is an EXCELLENT upgrade. HUGE time saver! Its was really nice to make adjustments on the fly. The rivets on the toolbox sides were set using the pneumatic squeezer. To try something different, remember this is where I want to make my mistakes, I bucked the hing rivets. Not bad either. First 2 or 3 rivets was a trial and error type thing just getting used to the pounding vibration and POWER of the gun. Having an adjustable valve a the air hose connection on the gun was great! First rivet was nearly flattened out but acceptable for the toolbox. After that, they only got better except for the last 2 rivets for the build, the hinge rivets. Had a hard time balancing the lid vertical while attempting to apply pressure on both ends of the rivets to set it. YUP...got a whopping smile. All in all, quite impressed with my first rivets. Oh, for got to mention, all dimples were set using the DRDT-2. That thing makes making dimples so mindless I won't bother describing how easy that piece is to use.
Pictures for memories really. my first riveted piece.
The Tool box how it arrives from Vans Aircraft.
The parts...
After deburring all parts, my first rivets set with the pneumatic squeezer.
All rivets nice and flush.
The completed tool box. Now it just needs and airplane to ride in the luggage compartment with tools at the ready.
Oh yea, the first smiles. Happened on the last 2 rivets!!! Jeez....
And the stupid hinge. If this was an actual airplane part, you better believe I would have ordered a new hinge before riveting.
Next up...the practice control surface...
More tools....
The pneumatic squeezer, 3" yoke, flange yoke, and 4" thin nose yoke arrived today. Also in the box was the fly cutter, and CT tiedown kit, torque seal and a variety of "sets".
The squeezer is....AWSOME! Love it. Started using tonight. Perfect rivet EVERY TIME!
The pneumatic squeezer, 3" yoke, flange yoke, and 4" thin nose yoke arrived today. Also in the box was the fly cutter, and CT tiedown kit, torque seal and a variety of "sets".
The squeezer is....AWSOME! Love it. Started using tonight. Perfect rivet EVERY TIME!
Subscribe to:
Posts (Atom)
























